Time-To-Build and Convex Adjustment Costs /
This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistical...
| Autore principale: | |
|---|---|
| Natura: | Periodico |
| Lingua: | English |
| Pubblicazione: |
Washington, D.C. :
International Monetary Fund,
2001.
|
| Serie: | IMF Working Papers; Working Paper ;
No. 2001/009 |
| Accesso online: | Full text available on IMF |
| Riassunto: | This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistically high. Exploiting another approach, I test directly the restrictions imposed by time-to-build on the investment equation. The results indicate that these restrictions cannot be rejected for five of the sixteen industries in the sample. Finally I show that time-to-build can explain approximately one-third of the variation in persistence of structure investment across four-digit industries. |
|---|---|
| Descrizione del documento: | <strong>Off-Campus Access:</strong> No User ID or Password Required <strong>On-Campus Access:</strong> No User ID or Password Required |
| Descrizione fisica: | 1 online resource (23 pages) |
| Natura: | Mode of access: Internet |
| ISSN: | 1018-5941 |
| Accesso: | Electronic access restricted to authorized BRAC University faculty, staff and students |