Time-To-Build and Convex Adjustment Costs /

This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistical...

Descrizione completa

Dettagli Bibliografici
Autore principale: Koeva Brooks, Petya
Natura: Periodico
Lingua:English
Pubblicazione: Washington, D.C. : International Monetary Fund, 2001.
Serie:IMF Working Papers; Working Paper ; No. 2001/009
Accesso online:Full text available on IMF
Descrizione
Riassunto:This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistically high. Exploiting another approach, I test directly the restrictions imposed by time-to-build on the investment equation. The results indicate that these restrictions cannot be rejected for five of the sixteen industries in the sample. Finally I show that time-to-build can explain approximately one-third of the variation in persistence of structure investment across four-digit industries.
Descrizione del documento:<strong>Off-Campus Access:</strong> No User ID or Password Required
<strong>On-Campus Access:</strong> No User ID or Password Required
Descrizione fisica:1 online resource (23 pages)
Natura:Mode of access: Internet
ISSN:1018-5941
Accesso:Electronic access restricted to authorized BRAC University faculty, staff and students