Sierra Leone : Fifth Review Under the Arrangement Under the Poverty Reduction and Growth Facility, Request for Waiver of Nonobservance of Performance Criterion, Request for Modification of Performance Criteria, and Financing Assurances Review.
This paper discusses key findings of the Fifth Review Under the Poverty Reduction and Growth Facility Arrangement for Sierra Leone. Program performance in the first half of 2009 was satisfactory. All end-June quantitative performance criteria were met, as were all end-June structural benchmarks, alt...
| Corporate Author: | |
|---|---|
| Format: | Journal |
| Language: | English |
| Published: |
Washington, D.C. :
International Monetary Fund,
2010.
|
| Series: | IMF Staff Country Reports; Country Report ;
No. 2010/015 |
| Online Access: | Full text available on IMF |
| Summary: | This paper discusses key findings of the Fifth Review Under the Poverty Reduction and Growth Facility Arrangement for Sierra Leone. Program performance in the first half of 2009 was satisfactory. All end-June quantitative performance criteria were met, as were all end-June structural benchmarks, although one with a delay. One of the two structural benchmarks for September 2009 was met, while the other was missed. Fiscal policy for the remainder of 2009 will aim to keep domestic revenue collection on track while containing unanticipated spending pressures. |
|---|---|
| Item Description: | <strong>Off-Campus Access:</strong> No User ID or Password Required <strong>On-Campus Access:</strong> No User ID or Password Required |
| Physical Description: | 1 online resource (75 pages) |
| Format: | Mode of access: Internet |
| ISSN: | 1934-7685 |
| Access: | Electronic access restricted to authorized BRAC University faculty, staff and students |