Grenada : First Review Under the Poverty Reduction and Growth Facility Arrangement, Request for Waiver of Performance Criterion, Financing Assurance Review, Request for Rephasing and Extension of the Arrangement, and Request for Augmentation-Staff Report; Staff Supplement; and Press Release on the Executive Board Discussion.

The staff report for the First Review Under the Poverty Reduction and Growth Facility (PRGF) Arrangement highlights Grenada's economic performance in many respects. The time needed to address the unregulated bank, as well as fiscal slippages and the slow pace of structural reform, delayed compl...

Szczegółowa specyfikacja

Opis bibliograficzny
Korporacja: International Monetary Fund
Format: Czasopismo
Język:English
Wydane: Washington, D.C. : International Monetary Fund, 2008.
Seria:IMF Staff Country Reports; Country Report ; No. 2008/357
Dostęp online:Full text available on IMF
LEADER 01934cas a2200241 a 4500
001 AALejournalIMF005464
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781451816532 
022 |a 1934-7685 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund. 
245 1 0 |a Grenada :   |b First Review Under the Poverty Reduction and Growth Facility Arrangement, Request for Waiver of Performance Criterion, Financing Assurance Review, Request for Rephasing and Extension of the Arrangement, and Request for Augmentation-Staff Report; Staff Supplement; and Press Release on the Executive Board Discussion. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2008. 
300 |a 1 online resource (78 pages) 
490 1 |a IMF Staff Country Reports 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a The staff report for the First Review Under the Poverty Reduction and Growth Facility (PRGF) Arrangement highlights Grenada's economic performance in many respects. The time needed to address the unregulated bank, as well as fiscal slippages and the slow pace of structural reform, delayed completion of the first PRGF review. The program entails some risks, particularly with respect to bank restructuring costs, expenditure control, implementation capacity, and natural disasters. The government is considering a concessional loan from the Export-Import Bank of China to finance the construction of a port and marina. 
538 |a Mode of access: Internet 
830 0 |a IMF Staff Country Reports; Country Report ;  |v No. 2008/357 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/002/2008/357/002.2008.issue-357-en.xml  |z IMF e-Library