|
|
|
|
| LEADER |
01698cas a2200241 a 4500 |
| 001 |
AALejournalIMF005026 |
| 008 |
230101c9999 xx r poo 0 0eng d |
| 020 |
|
|
|c 5.00 USD
|
| 020 |
|
|
|z 9781451869682
|
| 022 |
|
|
|a 1018-5941
|
| 040 |
|
|
|a BD-DhAAL
|c BD-DhAAL
|
| 100 |
1 |
|
|a Al-Zein, Eza Ghassan.
|
| 245 |
1 |
0 |
|a Reserve Requirements, the Maturity Structure of Debt, and Bank Runs /
|c Eza Ghassan Al-Zein.
|
| 264 |
|
1 |
|a Washington, D.C. :
|b International Monetary Fund,
|c 2008.
|
| 300 |
|
|
|a 1 online resource (26 pages)
|
| 490 |
1 |
|
|a IMF Working Papers
|
| 500 |
|
|
|a <strong>Off-Campus Access:</strong> No User ID or Password Required
|
| 500 |
|
|
|a <strong>On-Campus Access:</strong> No User ID or Password Required
|
| 506 |
|
|
|a Electronic access restricted to authorized BRAC University faculty, staff and students
|
| 520 |
3 |
|
|a The paper looks at the relationship between reserve requirements and the choice of the maturity structure of external debt in a general equilibrium setup, by incorporating the role of international lenders. A date- and maturity-specific reserve requirement is a fraction of the debt to be deposited in a non-interest bearing account at the central bank. At maturity, the central bank returns the reserves. There exist some specific combinations of date- and maturity-specific reserve requirements that reduce the vulnerability to bank runs. In such setup, lenders may still want to provide new short-term lending to the bank after a bank run.
|
| 538 |
|
|
|a Mode of access: Internet
|
| 830 |
|
0 |
|a IMF Working Papers; Working Paper ;
|v No. 2008/108
|
| 856 |
4 |
0 |
|z Full text available on IMF
|u http://elibrary.imf.org/view/journals/001/2008/108/001.2008.issue-108-en.xml
|z IMF e-Library
|