Beyond the Big Ditch
| Prif Awdur: | Carse |
|---|---|
| Fformat: | Electronig eLyfr |
| Iaith: | English |
| Cyhoeddwyd: |
The MIT Press
|
| Pynciau: | |
| Mynediad Ar-lein: | Full text available on Project MUSE [12/5/14] Off-campus access |
Eitemau Tebyg
-
In the Kingdom of the Ditch
gan: Davis -
Cut-off ditch for UB (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
North entrance cable ditch (RFA-470_Rev.A)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
VO#019 rain chain & cut-off ditch work
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Cut-Off ditch in the south of utility building (RFA-312_Rev A)
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023)