|
|
|
|
LEADER |
01172nam a2200313 a 4500 |
001 |
2979 |
003 |
BD-DhAAL |
005 |
20151011102203.0 |
008 |
900508s1990 vtua 001 0 eng |
010 |
|
|
|a 90070730
|
020 |
|
|
|a 0471132764
|
020 |
|
|
|a 093924618X
|
040 |
|
|
|a DLC
|c DLC
|d DLC
|d BD-DhAAL
|
050 |
0 |
0 |
|a TS157.5
|b .C67 1990
|
082 |
0 |
0 |
|a 658.5/3
|2 20
|
100 |
1 |
|
|a Correll, James G.
|9 15259
|
245 |
1 |
0 |
|a Gaining control :
|b capacity management and scheduling /
|c James G. Correll, Norris W. Edson.
|
260 |
|
|
|a Essex Junction, VT :
|a New York :
|b O. Wight Ltd. Publications,
|b Jogn Wiley & Sons,
|c c1990.
|
300 |
|
|
|a xii, 208 p. :
|b ill. ;
|c 24 cm.
|
500 |
|
|
|a Includes index.
|
541 |
|
|
|e 2979
|
650 |
|
0 |
|a Production scheduling.
|9 15260
|
650 |
|
0 |
|a Manufacturing resource planning.
|9 15261
|
650 |
|
0 |
|a Just-in-time systems.
|9 15262
|
650 |
|
0 |
|a Industrial capacity
|x Management.
|9 15263
|
700 |
1 |
|
|a Edson, Norris W.
|9 15264
|
942 |
|
|
|2 ddc
|c BK
|
999 |
|
|
|c 35745
|d 35745
|
952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 658_500000000000000_3_COR
|7 0
|9 56210
|a SCL
|b SCL
|c GEN
|d 2015-10-11
|e Gift: The Asia Foundation
|l 1
|o 658.53 COR
|p 3020002979
|r 2023-11-02
|s 2023-10-28
|t 1
|w 2015-10-11
|y BK
|