Business development and bid management at Bangladesh Engineering & Construction Corporation Ltd. (BECC)
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016.
| 第一著者: | Faruqui, Minhaj Kamal |
|---|---|
| その他の著者: | Ahmed, Riyashad |
| フォーマット: | Internship report |
| 言語: | English |
| 出版事項: |
BRAC University
2017
|
| 主題: | |
| オンライン・アクセス: | http://hdl.handle.net/10361/8084 |
類似資料
-
Displaying Ad with Optimal Real-Time Bidding
著者:: Uddin, A F M Ahsan
出版事項: (2021) -
Minutes of pre-bid meeting with the bidders of fire door for BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Sustainable procurement through bidding process and effective negotiation
著者:: Talukdar, Nilon
出版事項: (2018) -
Minutes of pre-bid meeting with the vendors of generator of BRACU new campus
著者:: Brac University
出版事項: (2023)