Business development and bid management at Bangladesh Engineering & Construction Corporation Ltd. (BECC)
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016.
Päätekijä: | Faruqui, Minhaj Kamal |
---|---|
Muut tekijät: | Ahmed, Riyashad |
Aineistotyyppi: | Internship report |
Kieli: | English |
Julkaistu: |
BRAC University
2017
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/8084 |
Samankaltaisia teoksia
-
Displaying Ad with Optimal Real-Time Bidding
Tekijä: Uddin, A F M Ahsan
Julkaistu: (2021) -
Minutes of pre-bid meeting with the bidders of fire door for BRACU new campus project
Tekijä: Brac University
Julkaistu: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
Tekijä: Brac University
Julkaistu: (2023) -
Sustainable procurement through bidding process and effective negotiation
Tekijä: Talukdar, Nilon
Julkaistu: (2018) -
Minutes of pre-bid meeting with the vendors of generator of BRACU new campus
Tekijä: Brac University
Julkaistu: (2023)