Operation of substation design and quality control of Power Grid Company of Bangladesh Limited
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016.
| Главный автор: | Rashid, Humayun |
|---|---|
| Другие авторы: | Arifuzzaman, S. M |
| Формат: | Internship report |
| Язык: | English |
| Опубликовано: |
BRAC University
2016
|
| Предметы: | |
| Online-ссылка: | http://hdl.handle.net/10361/6150 |
Схожие документы
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Regarding the temporary substation (internal substation) of the project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Prospects and challenges of outsourcing in the context of power grid company of Bangladesh limited
по: Shihab, Mohammad Abdullah
Опубликовано: (2018) -
Documents for temporary substation
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Instruction to start the work of substation at BRACU new campus project
по: Brac University
Опубликовано: (2023)