Operation of substation design and quality control of Power Grid Company of Bangladesh Limited
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016.
Автор: | Rashid, Humayun |
---|---|
Інші автори: | Arifuzzaman, S. M |
Формат: | Internship report |
Мова: | English |
Опубліковано: |
BRAC University
2016
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/6150 |
Схожі ресурси
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Prospects and challenges of outsourcing in the context of power grid company of Bangladesh limited
за авторством: Shihab, Mohammad Abdullah
Опубліковано: (2018) -
Regarding the temporary substation (internal substation) of the project
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Documents for temporary substation
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Instruction to start the work of substation at BRACU new campus project
за авторством: Brac University
Опубліковано: (2023)