Operation of substation design and quality control of Power Grid Company of Bangladesh Limited
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016.
প্রধান লেখক: | |
---|---|
অন্যান্য লেখক: | |
বিন্যাস: | Internship report |
ভাষা: | English |
প্রকাশিত: |
BRAC University
2016
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/6150 |
id |
10361-6150 |
---|---|
record_format |
dspace |
spelling |
10361-61502019-09-30T03:13:51Z Operation of substation design and quality control of Power Grid Company of Bangladesh Limited Rashid, Humayun Arifuzzaman, S. M BRAC Business School, BRAC University Power Grid Company of Bangladesh Limited Substation design This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016. Cataloged from PDF version of Internship report. Includes bibliographical references. The purpose of this report to illustrate the operation of Substation Design & Quality Control as an Assistant Engineer of the department as well as to fulfill the partial requirement for MBA degree at BRAC University. The study is made under the supervision of Assistant Professor S.M. Arifuzzaman, BRAC University. Power Grid Company of Bangladesh Ltd. (PGCB) was formed under the restructuring process of Power Sector in Bangladesh with the objective of bringing about commercial environment including increase in efficiency, establishment of accountability and dynamism in accomplishing its objectives. PGCB was incorporated in November 1996 with an authorized capital of Tk.10 billion. It was entrusted with the responsibility to own the national power grid to operate and expand the same with efficiency. Pursuant to Government decision to transfer transmission assets to PGCB from Bangladesh Power Development Board (BPDB) and Dhaka Electric Supply Authority (DESA), PGCB completed taking over of all the transmission assets on 31.12.2002. PGCB expanded its network and capacity many fold and operating those efficiently and effectively. In the report, I have described the operation of substation design & quality control, my job responsibility, problems that the department is facing currently and finally recommendation. Humayun Rashid M. Business Administration 2016-08-14T05:07:37Z 2016-08-14T05:07:37Z 2016 2016-06-14 Internship report ID 13264026 http://hdl.handle.net/10361/6150 en BRAC University Internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 30 pages application/pdf BRAC University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
Power Grid Company of Bangladesh Limited Substation design |
spellingShingle |
Power Grid Company of Bangladesh Limited Substation design Rashid, Humayun Operation of substation design and quality control of Power Grid Company of Bangladesh Limited |
description |
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016. |
author2 |
Arifuzzaman, S. M |
author_facet |
Arifuzzaman, S. M Rashid, Humayun |
format |
Internship report |
author |
Rashid, Humayun |
author_sort |
Rashid, Humayun |
title |
Operation of substation design and quality control of Power Grid Company of Bangladesh Limited |
title_short |
Operation of substation design and quality control of Power Grid Company of Bangladesh Limited |
title_full |
Operation of substation design and quality control of Power Grid Company of Bangladesh Limited |
title_fullStr |
Operation of substation design and quality control of Power Grid Company of Bangladesh Limited |
title_full_unstemmed |
Operation of substation design and quality control of Power Grid Company of Bangladesh Limited |
title_sort |
operation of substation design and quality control of power grid company of bangladesh limited |
publisher |
BRAC University |
publishDate |
2016 |
url |
http://hdl.handle.net/10361/6150 |
work_keys_str_mv |
AT rashidhumayun operationofsubstationdesignandqualitycontrolofpowergridcompanyofbangladeshlimited |
_version_ |
1814308865220542464 |