CT2+CT3+UT2 - Public toilet (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | Drawings |
Språk: | English |
Publicerad: |
Brac University
2024
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/22600 |
Liknande verk
-
AT1,AT2 - Academic toilet (Architectural As Built Drawings)
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2024) -
PT1+PT2- public toilet (Architectural As Built Drawings)
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2024) -
Coordination drawing of basement 2 storey (Architectural As Built Drawings)
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2024) -
Coordination drawing of 2nd storey (Architectural As Built Drawings)
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2024) -
Architecture drawing for toilet of CT2+CT3+UT2 (1F) (RFA-541_Rev.A)
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023)