AT1,AT2 - Academic toilet (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | Drawings |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2024
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/22595 |
Eitemau Tebyg
-
PT1+PT2- public toilet (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
CT2+CT3+UT2 - Public toilet (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
AT3,AT4 - Academic toilet (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
Coordination drawing of basement 1 storey (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
AT5, AT6 - Academic toilet (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024)