AT1,AT2 - Academic toilet (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | Drawings |
اللغة: | English |
منشور في: |
Brac University
2024
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/22595 |
مواد مشابهة
-
PT1+PT2- public toilet (Architectural As Built Drawings)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2024) -
CT2+CT3+UT2 - Public toilet (Architectural As Built Drawings)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2024) -
AT3,AT4 - Academic toilet (Architectural As Built Drawings)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2024) -
Coordination drawing of basement 1 storey (Architectural As Built Drawings)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2024) -
AT5, AT6 - Academic toilet (Architectural As Built Drawings)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2024)