W5-B light -holder details (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Drawings |
Langue: | English |
Publié: |
Brac University
2024
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/22541 |
Documents similaires
-
W5-B light holder details (RFA-284_Rev A)
par: WOHA Designs PTE LTD, et autres
Publié: (2023) -
Coordination drawing of 5th storey (Architectural As Built Drawings)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Layout of CC3 & CC5 (Architectural As Built Drawings)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
AT5, AT6 - Academic toilet (Architectural As Built Drawings)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Miscellaneous details (Architectural As Built Drawings)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024)