Cut-off ditch for UB (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | Drawings |
Язык: | English |
Опубликовано: |
Brac University
2024
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/22539 |
Схожие документы
-
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
по: WOHA Designs PTE LTD, и др.
Опубликовано: (2023) -
VO#019 rain chain & cut-off ditch work
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Waterproofing (Architectural As Built Drawings)
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2024) -
Electrical as built drawings
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2024) -
North entrance (Architectural As Built Drawings)
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2024)