Cut-off ditch for UB (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | Drawings |
Taal: | English |
Gepubliceerd in: |
Brac University
2024
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/22539 |
Gelijkaardige items
-
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
VO#019 rain chain & cut-off ditch work
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Waterproofing (Architectural As Built Drawings)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
Electrical as built drawings
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
North entrance (Architectural As Built Drawings)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024)