Cut-off ditch for UB (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | Drawings |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2024
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/22539 |
Míreanna comhchosúla
-
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
de réir: WOHA Designs PTE LTD, et al.
Foilsithe / Cruthaithe: (2023) -
VO#019 rain chain & cut-off ditch work
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Waterproofing (Architectural As Built Drawings)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2024) -
Electrical as built drawings
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2024) -
North entrance (Architectural As Built Drawings)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2024)