Cut-off ditch for UB (Architectural As Built Drawings)
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | Drawings |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2024
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/22539 |
Eitemau Tebyg
-
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023) -
VO#019 rain chain & cut-off ditch work
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Waterproofing (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
Electrical as built drawings
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
North entrance (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024)