Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
Главный автор: | Aziz, Ahmed |
---|---|
Другие авторы: | Hossain, Saif |
Формат: | Internship report |
Язык: | English |
Опубликовано: |
Brac University
2024
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/22241 |
Схожие документы
-
Industrial wastewater treatment in developing countries.
Опубликовано: (1985) -
Business model canvas of sewage treatment plant
по: Alam, Walid
Опубликовано: (2021) -
Characterizing the optical property of plasmonic nanomaterial and use them to develop a tool for wastewater treatment
по: Islam, Md. Faqrul, и др.
Опубликовано: (2020) -
Municipal wastewater treatment in Central and Eastern Europe : present situation and cost-effective development strategies /
по: Somlyódy, L. (László)
Опубликовано: (1998) -
Isolation, characterization, identification and antimicrobial susceptibility testing of bacteria associated with pharmaceutical waste water treatment
по: Sharfin, Shah
Опубликовано: (2018)