Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
1. autor: | Aziz, Ahmed |
---|---|
Kolejni autorzy: | Hossain, Saif |
Format: | Internship report |
Język: | English |
Wydane: |
Brac University
2024
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/22241 |
Podobne zapisy
-
Industrial wastewater treatment in developing countries.
Wydane: (1985) -
Business model canvas of sewage treatment plant
od: Alam, Walid
Wydane: (2021) -
Characterizing the optical property of plasmonic nanomaterial and use them to develop a tool for wastewater treatment
od: Islam, Md. Faqrul, i wsp.
Wydane: (2020) -
Municipal wastewater treatment in Central and Eastern Europe : present situation and cost-effective development strategies /
od: Somlyódy, L. (László)
Wydane: (1998) -
Isolation, characterization, identification and antimicrobial susceptibility testing of bacteria associated with pharmaceutical waste water treatment
od: Sharfin, Shah
Wydane: (2018)