Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
Autore principale: | Aziz, Ahmed |
---|---|
Altri autori: | Hossain, Saif |
Natura: | Internship report |
Lingua: | English |
Pubblicazione: |
Brac University
2024
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/22241 |
Documenti analoghi
-
Industrial wastewater treatment in developing countries.
Pubblicazione: (1985) -
Business model canvas of sewage treatment plant
di: Alam, Walid
Pubblicazione: (2021) -
Characterizing the optical property of plasmonic nanomaterial and use them to develop a tool for wastewater treatment
di: Islam, Md. Faqrul, et al.
Pubblicazione: (2020) -
Municipal wastewater treatment in Central and Eastern Europe : present situation and cost-effective development strategies /
di: Somlyódy, L. (László)
Pubblicazione: (1998) -
Isolation, characterization, identification and antimicrobial susceptibility testing of bacteria associated with pharmaceutical waste water treatment
di: Sharfin, Shah
Pubblicazione: (2018)