Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
Autor principal: | Aziz, Ahmed |
---|---|
Altres autors: | Hossain, Saif |
Format: | Internship report |
Idioma: | English |
Publicat: |
Brac University
2024
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/22241 |
Ítems similars
-
Industrial wastewater treatment in developing countries.
Publicat: (1985) -
Business model canvas of sewage treatment plant
per: Alam, Walid
Publicat: (2021) -
Characterizing the optical property of plasmonic nanomaterial and use them to develop a tool for wastewater treatment
per: Islam, Md. Faqrul, et al.
Publicat: (2020) -
Municipal wastewater treatment in Central and Eastern Europe : present situation and cost-effective development strategies /
per: Somlyódy, L. (László)
Publicat: (1998) -
Isolation, characterization, identification and antimicrobial susceptibility testing of bacteria associated with pharmaceutical waste water treatment
per: Sharfin, Shah
Publicat: (2018)