Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
Autor principal: | Aziz, Ahmed |
---|---|
Outros Autores: | Hossain, Saif |
Formato: | Internship report |
Idioma: | English |
Publicado em: |
Brac University
2024
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/22241 |
Registos relacionados
-
Industrial wastewater treatment in developing countries.
Publicado em: (1985) -
Business model canvas of sewage treatment plant
Por: Alam, Walid
Publicado em: (2021) -
Characterizing the optical property of plasmonic nanomaterial and use them to develop a tool for wastewater treatment
Por: Islam, Md. Faqrul, et al.
Publicado em: (2020) -
Municipal wastewater treatment in Central and Eastern Europe : present situation and cost-effective development strategies /
Por: Somlyódy, L. (László)
Publicado em: (1998) -
Isolation, characterization, identification and antimicrobial susceptibility testing of bacteria associated with pharmaceutical waste water treatment
Por: Sharfin, Shah
Publicado em: (2018)