Aziz, A., & Hossain, S. (2024). Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh. Brac University.
Lua i Stíl Chicago (17ú heag.)Aziz, Ahmed, agus Saif Hossain. Challenges of Building a Waste Water Treatment Plant Under PPP Model at Gazipur, Bangladesh. Brac University, 2024.
Lua MLA (8ú heag.)Aziz, Ahmed, agus Saif Hossain. Challenges of Building a Waste Water Treatment Plant Under PPP Model at Gazipur, Bangladesh. Brac University, 2024.
Rabhadh: Seans nach mbeach na luanna seo go hiomlán cruinn i ngach uile chás.