Conceptualized and development of preliminary strategic procurement planning analysis outline for Local Government Engineering Department (LGED)
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2023.
第一著者: | Raihan, Md. Abu |
---|---|
その他の著者: | Rahman , Mir Mehbubur |
フォーマット: | Internship report |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/21956 |
類似資料
-
Challenges of adopting strategic procurement policies: a case study of infrastructure Development Company Limited
著者:: Islam, Md. Maidul
出版事項: (2018) -
e-procurement and transparency in public sector : a case of Local Government Engineering Department (LGED), Dhamoirhat upazila,Naogaon.
著者:: Ahmed, Hussain
出版事項: (2018) -
Scope and practices of sustainable procurement in Local Government Engineering Department (LGED), Bangladesh: A case study on Rupganj Upazila, Narayanganj
著者:: Sharmin, Surayia
出版事項: (2023) -
Benefits and difficulties of Electronic Government Procurement (e- GP); an analysis of Local Government Engineering Department (LGED), Thakurgaon
著者:: Prodhan, Md. Manjur Alam
出版事項: (2018) -
Measuring procurement performance of LGED and RHD based on key performance indicators (KPIs)
著者:: Kamruzzaman, Abu Sayed Md.
出版事項: (2016)