Vehicle entry & exit ramp of BRAC University new campus project
This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
| Glavni avtor: | WEB Structures |
|---|---|
| Format: | Drawings |
| Jezik: | English |
| Izdano: |
Brac University
2023
|
| Teme: | |
| Online dostop: | http://hdl.handle.net/10361/21606 |
Podobne knjige/članki
-
Vehicle ramp from basement 3 to basement 1 of BRAC University new campus project
od: WEB Structures
Izdano: (2023) -
Bus ramp of BRAC University new campus project
od: WEB Structures
Izdano: (2023) -
Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
od: WOHA Designs PTE LTD, et al.
Izdano: (2023) -
Entrance piles plan of BRAC University new campus project
od: WEB Structures
Izdano: (2023) -
South porch of BRAC University new campus project
od: WEB Structures
Izdano: (2023)