Pile caps and raft of BRAC University new campus project
This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of PDF & DWG version of drawings.
Auteur principal: | WEB Structures |
---|---|
Format: | Drawings |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/21567 |
Documents similaires
-
Layout of capping beam of BRAC University new campus project
par: WEB Structures
Publié: (2023) -
Utility building of BRAC University new campus project
par: WEB Structures
Publié: (2023) -
East-North entrance of BRAC University new campus project
par: WEB Structures
Publié: (2023) -
Entrance piles plan of BRAC University new campus project
par: WEB Structures
Publié: (2023) -
Pilecaps and raft of structural as built drawing of BRAC University New Campus Project for RAJUK
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024)