STP & water tank section=4-4 of BRAC University new campus project
This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.
Автор: | |
---|---|
Формат: | Drawings |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/21435 |
id |
10361-21435 |
---|---|
record_format |
dspace |
spelling |
10361-214352023-10-08T10:26:58Z STP & water tank section=4-4 of BRAC University new campus project Electro-Mechanical Control Services (EMCS) New campus project MEP design MEP drawing Plumbing designs Plumbing drawing Consultant drawing STP Water tank Sewage Treatment Plant This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings. 2023-10-01T10:10:34Z 2023-10-01T10:10:34Z ©2019 2019-04-20 Drawings Design no.: MP-P.51 http://hdl.handle.net/10361/21435 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 2 pages application/octet-stream Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project MEP design MEP drawing Plumbing designs Plumbing drawing Consultant drawing STP Water tank Sewage Treatment Plant |
spellingShingle |
New campus project MEP design MEP drawing Plumbing designs Plumbing drawing Consultant drawing STP Water tank Sewage Treatment Plant Electro-Mechanical Control Services (EMCS) STP & water tank section=4-4 of BRAC University new campus project |
description |
This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings. |
format |
Drawings |
author |
Electro-Mechanical Control Services (EMCS) |
author_facet |
Electro-Mechanical Control Services (EMCS) |
author_sort |
Electro-Mechanical Control Services (EMCS) |
title |
STP & water tank section=4-4 of BRAC University new campus project |
title_short |
STP & water tank section=4-4 of BRAC University new campus project |
title_full |
STP & water tank section=4-4 of BRAC University new campus project |
title_fullStr |
STP & water tank section=4-4 of BRAC University new campus project |
title_full_unstemmed |
STP & water tank section=4-4 of BRAC University new campus project |
title_sort |
stp & water tank section=4-4 of brac university new campus project |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/21435 |
work_keys_str_mv |
AT electromechanicalcontrolservicesemcs stpwatertanksection44ofbracuniversitynewcampusproject |
_version_ |
1814309380370202624 |