Sanitary & drainage system riser diagram
This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.
Auteur principal: | Electro-Mechanical Control Services (EMCS) |
---|---|
Format: | Drawings |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/21425 |
Documents similaires
-
Sanitary & plumbing legend
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023) -
Index of plumbing & sanitary drawing
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023) -
Top sheet of plumbing & sanitary works drawings
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023) -
Treated water supply riser diagram
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023) -
Isometric view for rain water drainage system
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023)