Prototype room of PT2 toilet on ground floor (RFA-327_Rev B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
Prif Awduron: | WOHA Designs PTE LTD, BUCG-ABC Joint Venture, Web Structures |
---|---|
Fformat: | Drawings |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/21273 |
Eitemau Tebyg
-
Request for MEP materials supply for prototype room of PT2 toilet and GF
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Request for MEP material for the prototype room of PT2 on ground floor
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Regarding entrance of prototype room (PT2 toilet room on GF) materials supplied by client
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
PT1+PT2- public toilet (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
Request for decoration material supply for prototype room of PT2 toilet and GF
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)