CC3 & CC5 demarcation layout of B1-12F (RFA-516_Rev.D)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of PDF version of drawings.
| 主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| 格式: | Drawings |
| 語言: | English |
| 出版: |
Brac University
2023
|
| 主題: | |
| 在線閱讀: | http://hdl.handle.net/10361/21175 |
相似書籍
-
Architectural - CC5 setting out for exterior wall (RFA-224_Rev A)
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
CC3 & CC5 demarcation layout of roof storey (RFA-413_Rev B)
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
Architectural shop drawing of CC3 & CC5 demarcation layout of roof storey (RFA-413_Rev B)
由: BUCG-ABC Joint Venture
出版: (2023) -
CM7 detail update and CC7 in MPH (RFA-521_Rev.D)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Basement finishes demarcation (RFA-407_Rev D)
由: WOHA Designs PTE LTD, et al.
出版: (2023)