CC3 & CC5 demarcation layout of B1-12F (RFA-516_Rev.D)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of PDF version of drawings.
| Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | Drawings |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/21175 |
Similar Items
-
Architectural - CC5 setting out for exterior wall (RFA-224_Rev A)
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
CC3 & CC5 demarcation layout of roof storey (RFA-413_Rev B)
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
Architectural shop drawing of CC3 & CC5 demarcation layout of roof storey (RFA-413_Rev B)
by: BUCG-ABC Joint Venture
Published: (2023) -
CM7 detail update and CC7 in MPH (RFA-521_Rev.D)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Basement finishes demarcation (RFA-407_Rev D)
by: WOHA Designs PTE LTD, et al.
Published: (2023)