Approval of non-schedule item for RCC bench & floor joints
This variation order has been made between Brac University and BUCG-ABC joint venture for approval of approval of non-schedule item for RCC bench & floor joints of Brac University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Variation order |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/21109 |
Ítems similars
-
VO#044 The quotation for RCC bench & floor joints at stair
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
VO#044 The quotation for RCC bench & floor joints at stair rev.01
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Approval of unit rate of non-schedule item for supplying, fabrication and installation of study nook work
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Approval of unit rate of non-schedule item for supplying fabrication and installation of study nook work
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)