Approval of non-schedule item for RCC bench & floor joints
This variation order has been made between Brac University and BUCG-ABC joint venture for approval of approval of non-schedule item for RCC bench & floor joints of Brac University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | Variation order |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/21109 |
Eitemau Tebyg
-
VO#044 The quotation for RCC bench & floor joints at stair
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
VO#044 The quotation for RCC bench & floor joints at stair rev.01
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Approval of unit rate of non-schedule item for supplying, fabrication and installation of study nook work
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Approval of unit rate of non-schedule item for supplying fabrication and installation of study nook work
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)