Rebar welding at permanent caping in D-wall
This variation order has been made between Brac University and BUCG-ABC joint venture for rebar welding at permanent caping in D-wall of Brac University new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Variation order |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/21087 |
Ähnliche Einträge
-
Rebar welding at permanent caping in D-wall
von: Brac University
Veröffentlicht: (2023) -
D-wall remedial work
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
von: Brac University
Veröffentlicht: (2023) -
Valuation of rebar connection via mechanical coupler
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Additional wall attached to diaphragm wall
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023)