Rebar welding at permanent caping in D-wall
This variation order has been made between Brac University and BUCG-ABC joint venture for rebar welding at permanent caping in D-wall of Brac University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Variation order |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/21087 |
Ítems similars
-
Rebar welding at permanent caping in D-wall
per: Brac University
Publicat: (2023) -
D-wall remedial work
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
per: Brac University
Publicat: (2023) -
Valuation of rebar connection via mechanical coupler
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Additional wall attached to diaphragm wall
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)