Rebar welding at permanent caping in D-wall
This variation order has been made between Brac University and BUCG-ABC joint venture for rebar welding at permanent caping in D-wall of Brac University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | Variation order |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/21087 |
مواد مشابهة
-
Rebar welding at permanent caping in D-wall
بواسطة: Brac University
منشور في: (2023) -
D-wall remedial work
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
بواسطة: Brac University
منشور في: (2023) -
Valuation of rebar connection via mechanical coupler
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Additional wall attached to diaphragm wall
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)