Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
This variation order has been made between Brac University and BUCG-ABC joint venture for approval of unit rates of non-schedule item UPVC Pipe changed from PVC pipe for conduit works of Brac University new campus project.
Egile nagusia: | |
---|---|
Formatua: | Variation order |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/21082 |
id |
10361-21082 |
---|---|
record_format |
dspace |
spelling |
10361-210822023-10-08T08:55:49Z Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project Variation order BUCG-ABC UPVC Pipe Unit rates of non-schedule item This variation order has been made between Brac University and BUCG-ABC joint venture for approval of unit rates of non-schedule item UPVC Pipe changed from PVC pipe for conduit works of Brac University new campus project. 2023-09-20T08:36:40Z 2023-09-20T08:36:40Z ©2019 2019-11-16 Variation order http://hdl.handle.net/10361/21082 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 8 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project Variation order BUCG-ABC UPVC Pipe Unit rates of non-schedule item |
spellingShingle |
New campus project Variation order BUCG-ABC UPVC Pipe Unit rates of non-schedule item BUCG-ABC Joint Venture (BUCG-ABC JV) Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
description |
This variation order has been made between Brac University and BUCG-ABC joint venture for approval of unit rates of non-schedule item UPVC Pipe changed from PVC pipe for conduit works of Brac University new campus project. |
format |
Variation order |
author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
title |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
title_short |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
title_full |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
title_fullStr |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
title_full_unstemmed |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
title_sort |
approval of unit rates of non-schedule item upvc pipe changed from pvc pipe for conduit works |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/21082 |
work_keys_str_mv |
AT bucgabcjointventurebucgabcjv approvalofunitratesofnonscheduleitemupvcpipechangedfrompvcpipeforconduitworks |
_version_ |
1814307290688258048 |