Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
This variation order has been made between Brac University and BUCG-ABC joint venture for approval of unit rates of non-schedule item UPVC Pipe changed from PVC pipe for conduit works of Brac University new campus project.
| Autor principal: | |
|---|---|
| Formato: | Variation order |
| Idioma: | English |
| Publicado em: |
Brac University
2023
|
| Assuntos: | |
| Acesso em linha: | http://hdl.handle.net/10361/21082 |
| id |
10361-21082 |
|---|---|
| record_format |
dspace |
| spelling |
10361-210822023-10-08T08:55:49Z Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project Variation order BUCG-ABC UPVC Pipe Unit rates of non-schedule item This variation order has been made between Brac University and BUCG-ABC joint venture for approval of unit rates of non-schedule item UPVC Pipe changed from PVC pipe for conduit works of Brac University new campus project. 2023-09-20T08:36:40Z 2023-09-20T08:36:40Z ©2019 2019-11-16 Variation order http://hdl.handle.net/10361/21082 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 8 pages application/pdf Brac University |
| institution |
Brac University |
| collection |
Institutional Repository |
| language |
English |
| topic |
New campus project Variation order BUCG-ABC UPVC Pipe Unit rates of non-schedule item |
| spellingShingle |
New campus project Variation order BUCG-ABC UPVC Pipe Unit rates of non-schedule item BUCG-ABC Joint Venture (BUCG-ABC JV) Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
| description |
This variation order has been made between Brac University and BUCG-ABC joint venture for approval of unit rates of non-schedule item UPVC Pipe changed from PVC pipe for conduit works of Brac University new campus project. |
| format |
Variation order |
| author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| title |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
| title_short |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
| title_full |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
| title_fullStr |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
| title_full_unstemmed |
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works |
| title_sort |
approval of unit rates of non-schedule item upvc pipe changed from pvc pipe for conduit works |
| publisher |
Brac University |
| publishDate |
2023 |
| url |
http://hdl.handle.net/10361/21082 |
| work_keys_str_mv |
AT bucgabcjointventurebucgabcjv approvalofunitratesofnonscheduleitemupvcpipechangedfrompvcpipeforconduitworks |
| _version_ |
1814307290688258048 |