Additional wall attached to diaphragm wall
This variation order has been made between Brac University and BUCG-ABC joint venture for additional wall attached to diaphragm wall of Brac University new campus project.
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | Variation order |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/21080 |
Benzer Materyaller
-
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
Quotation for the additional wall attached to the diaphragm wall
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Substantiation of claims diaphragm wall
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Waterproofing for retaining wall
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023)