Additional wall attached to diaphragm wall
This variation order has been made between Brac University and BUCG-ABC joint venture for additional wall attached to diaphragm wall of Brac University new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Variation order |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/21080 |
Ähnliche Einträge
-
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023) -
Quotation for the additional wall attached to the diaphragm wall
von: Brac University
Veröffentlicht: (2023) -
Substantiation of claims diaphragm wall
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Waterproofing for retaining wall
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023)