Additional wall attached to diaphragm wall
This variation order has been made between Brac University and BUCG-ABC joint venture for additional wall attached to diaphragm wall of Brac University new campus project.
| Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | Variation order |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/21080 |
Similar Items
-
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
by: BUCG-ABC Joint Venture
Published: (2023) -
Quotation for the additional wall attached to the diaphragm wall
by: Brac University
Published: (2023) -
Substantiation of claims diaphragm wall
by: BUCG-ABC Joint Venture
Published: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Waterproofing for retaining wall
by: BUCG-ABC Joint Venture
Published: (2023)