Additional wall attached to diaphragm wall
This variation order has been made between Brac University and BUCG-ABC joint venture for additional wall attached to diaphragm wall of Brac University new campus project.
| Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Formato: | Variation order |
| Lenguaje: | English |
| Publicado: |
Brac University
2023
|
| Materias: | |
| Acceso en línea: | http://hdl.handle.net/10361/21080 |
Ejemplares similares
-
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Quotation for the additional wall attached to the diaphragm wall
por: Brac University
Publicado: (2023) -
Substantiation of claims diaphragm wall
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Waterproofing for retaining wall
por: BUCG-ABC Joint Venture
Publicado: (2023)