Valuation of rebar connection via mechanical coupler
This variation order has been made between Brac University and BUCG-ABC Joint Venture for approval of valuation of rebar connection via mechanical coupler of Brac University new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | Variation order |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/21045 |
類似資料
-
Valuation of rebar connection via mechanical coupler
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Valuation of rebar connection via mechanical coupler
著者:: Brac University
出版事項: (2023) -
Rebar welding at permanent caping in D-wall
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Valuation- non tender for bracing redesign & related work
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Steel structure work for catwalk & spiral stair
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)