D-wall remedial work
This variation order has been made between Brac University and BUCG-ABC Joint Venture for D-wall remedial work -of guide wall of Brac University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | Variation order |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/21038 |
Παρόμοια τεκμήρια
-
Remedial work of the D-wall
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Request regarding the remedial work of D- wall
ανά: BUCG-ABC Joint Venture
Έκδοση: (2023) -
V0.05 - Valuation of D-wall remedial works
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Rebar welding at permanent caping in D-wall
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Additional wall attached to diaphragm wall
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023)