D-wall remedial work
This variation order has been made between Brac University and BUCG-ABC Joint Venture for D-wall remedial work -of guide wall of Brac University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | Variation order |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/21038 |
Liknande verk
-
Remedial work of the D-wall
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Request regarding the remedial work of D- wall
av: BUCG-ABC Joint Venture
Publicerad: (2023) -
V0.05 - Valuation of D-wall remedial works
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Rebar welding at permanent caping in D-wall
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Additional wall attached to diaphragm wall
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023)