Waterproofing for retaining wall
This variation order has been made between Brac University and BUCG-ABC Joint Venture fo waterproofing for retaining wall of dismantling of guide wall of Brac University new campus project.
主要作者: | BUCG-ABC Joint Venture |
---|---|
格式: | Variation order |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/21031 |
相似書籍
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
由: BUCG-ABC Joint Venture
出版: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
由: BUCG-ABC Joint Venture
出版: (2023) -
Additional wall attached to diaphragm wall
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
D-wall remedial work
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)