Waterproofing for retaining wall
This variation order has been made between Brac University and BUCG-ABC Joint Venture fo waterproofing for retaining wall of dismantling of guide wall of Brac University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture |
---|---|
Định dạng: | Variation order |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/21031 |
Những quyển sách tương tự
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
Additional wall attached to diaphragm wall
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
D-wall remedial work
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)