Waterproofing for retaining wall
This variation order has been made between Brac University and BUCG-ABC Joint Venture fo waterproofing for retaining wall of dismantling of guide wall of Brac University new campus project.
1. autor: | BUCG-ABC Joint Venture |
---|---|
Format: | Variation order |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/21031 |
Podobne zapisy
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Additional wall attached to diaphragm wall
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
D-wall remedial work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)