Waterproofing for retaining wall
This variation order has been made between Brac University and BUCG-ABC Joint Venture fo waterproofing for retaining wall of dismantling of guide wall of Brac University new campus project.
Glavni autor: | BUCG-ABC Joint Venture |
---|---|
Format: | Variation order |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/21031 |
Similar Items
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
od: BUCG-ABC Joint Venture
Izdano: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
od: BUCG-ABC Joint Venture
Izdano: (2023) -
Additional wall attached to diaphragm wall
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
D-wall remedial work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023)