Waterproofing for retaining wall
This variation order has been made between Brac University and BUCG-ABC Joint Venture fo waterproofing for retaining wall of dismantling of guide wall of Brac University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture |
---|---|
التنسيق: | Variation order |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/21031 |
مواد مشابهة
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Additional wall attached to diaphragm wall
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
D-wall remedial work
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)