Detail of prayer room (RFA-556_Rev.B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Drawings |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/21023 |
Similar Items
-
Prayer room (Architectural As Built Drawings)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2024) -
Prayer room of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2024) -
Plan and details of learning labs type 5 (RFA-535_Rev.B)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Finish schedule detail (RFA-473_Rev.B)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Miscellaneous details 04 (RFA-565_Rev.B)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)