Technical specification of tiles pointing work of TL6 & CM2 (RFA-564_Rev.A)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Drawings |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/21020 |
Lignende værker
-
Methodology statement of tile construction (RFA-471_Rev.A)
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Mock-up for tiling work
af: Brac University
Udgivet: (2023) -
Roof floor tiles layout and finishes plan (RFA-505_Rev.A )
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Tiles exclusion of 4th & 5th floor (RFA / TILES-001)
af: DWm4 Intrends
Udgivet: (2023) -
Tiles exclusion of 4th & 5th floor (RFA / TILES-001)
af: DWm4 Intrends
Udgivet: (2023)