Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | Drawings |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/21002 |
Registos relacionados
-
Updated 6F-12F floor finish (RFA-544_Rev.A)
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Details of floor finish plan (Architectural As Built Drawings)
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2024) -
5F demarcation of finishes (RFA-504_Rev.A)
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
9F floor tiles layout and finishes (RFA-475_Rev.B)
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
6F floor tiles layout and finishes plan (RFA-479_Rev B)
Por: WOHA Designs PTE LTD, et al.
Publicado em: (2023)